| On
selected projects, Advanced Building Concepts
will work with your project team to considerably
reduce construction time. We will assemble a team
that includes key company personnel and representatives
from key subcontractors. With this team, schedules
can be developed and lead time materials can be
ordered before plans and specifications have been
completed. The construction is completed in a very
tight window, thus minimizing disruptions to the
client's operations. Although this method usually
generates higher construction costs, these costs
can be offset by the time saved. Our team determines
the viability of the Fast Track delivery method
on a case-by-case basis.
|
 |