NEW MODULAR HOMES AT PORTSMOUTH ABBEY
New Faculty Housing being built at Portsmouth Abbey

See the website for Blu Homes under the "Links" section for more information on these modular homes.








PORTSMOUTH ABBEY BOYS DORMITORY CONSTRUCTION PROGRESS
Construction is on-going at the Portsmouth Abbey Boys Dormitory project. See below "Read more" to see beginning phase of this project.



Walls and ceilings are being installed along with ductwork and interior electrical power.



Fire protection system being installed.




Copper roof and copper gutters as well as exterior siding.

CONSTRUCTION HAS BEGUN ON THE NEW BOYS DORMITORY
The site has been cleared and the construction begins on the new Boys Dormitory. Site work being done by J.A.M. Construction Co., Inc. of Middletown, RI






Clearing site




Installing the drains



Electrical power feeds are installed. Electrical work is being done by Wayne J. Griffin Electric, Inc. of Holliston, MA.



Footing Layout



Footings formed

Footings for the foundations are formed and poured with reinforcing rod inserted and forms stripped. Concrete foundation and concrete walls formed, poured and stripped. Foundation work and concrete walls being done by S & S Concrete Form Construction of Swansea, MA. Concrete provided by Cardi Materials, LLC of Warwick, RI.



Footings formed and poured.







Transformer installed and foundation walls formed, poured and stripped.















Preparing to pour basement walls



Installing footing drains



Rebar walls



Stripping basement walls



Damproofing foundation



Preparing to dig the elevator pit



Beginning the interior footings



Backfilling the foundations on the north and south sides of the West end of the building.



Pouring the interior piers and footings for columns for 1st floor deck



More footings for the deck, and the elevator pit to the right.









Construction of the Elevator Shaft



Elevator shaft near completion



Preparation for steel beams and metal decking

 