Advanced Building Concepts
was brought in early during the planning
phase of the Newport YMCA pool project to
help the owner select an architect. The
Design/Build approach was used to construct
the building to save time so that the YMCA
could open its pool doors to members as
soon as possible.
ABC’s value engineering
recommendation to change the mechanical
system from an electric dehumidification
system to an air exchange system saved the
YMCA $50,000 in installation costs plus
considerable long-term utility savings.
The building team recommended
the introduction of natural light inside
the pool area with a wall of windows along
the east side of the facility. Work on the
project included the demolition of the building
down to the foundation, the replacement
of wood walls with masonry, installation
of a vapor tight ventilating insulated roof
system and an efficient heat recovery/air
exchanger to control the air quality, temperature
and humidity of the building.
|